SPE Drilling & Completion
Volume 27, Number 4, December 2012, pp. 613-624

SPE-150581-PA

Ultralightweight Proppants: An Effective Approach To Address Problems in Long Horizontal Gravel Packs Offshore Brazil

View full textPDF ( 1,110 KB )

DOI  More information 10.2118/150581-PA http://dx.doi.org/10.2118/150581-PA

Citation

  • Jardim Neto, A.T., Prata, F.G.M., Gomez, J.R. et al. 2012. Ultralightweight Proppants: An Effective Approach To Address Problems in Long Horizontal Gravel Packs Offshore Brazil. SPE Drill & Compl 27 (4): 613-624. SPE-150581-PA. http://dx.doi.org/10.2118/150581-PA.

Summary

Operators developing reservoirs and producing them from deep and ultradeepwater wells are pushing the technical limits regarding horizontal extension. Deepwater wells completed in unconsolidated formations usually have low fracture gradients, severe leakoff zones, and/or significant washouts. Long horizontal open holes, therefore, may become technically difficult or economically unfeasible to gravel-pack with the use of conventional fluids and gravels. Typical completions in offshore Brazil start from a 95=8- or 103=4-in. casing, in which a 51=2-in. premium screen and tubular string is hung along an open hole drilled with an 81=2- or 91=2-in. bit. Horizontal extensions range from 980 to 4,000 ft. A variety of openhole gravel-pack techniques proved to be complex and costly, but ultralightweight (ULW) proppants have enabled simpler and more-cost-effective gravel packing in these longer horizontal open holes. The reduced gravel density allows a significant reduction in pumping rate that avoids fracturing the formation, minimizes fluid loss, and eliminates the risk of premature screenout caused by excessive gravel settling. ULW-proppant technology was introduced to Brazil in 2005 and has been applied successfully to gravel pack wells under extreme conditions such as low fracture gradient, severe fluid loss, and washed-out zones. ProppantULW-1.25 has proved to be effective for packing wells with narrow sections through the openhole interval, frequently found in horizontal wells completed through shale zones that are isolated by reactive packers and/or mechanical external casing packers. ULW-1.75 was introduced in Brazil in 2007 and has largely replaced ULW-1.25 for gravel packing wells in which an improvement in the operational pumping window is required. A combined package comprising ULW-1.75 during the alpha-wave phase and ULW-1.25 during the beta-wave phase is also discussed. This paper summarizes the procedures and results of almost 60 wells that have been gravel packed with the use of ULW-proppant technology pumped for a local operator.

View full textPDF ( 1,110 KB )

History

  • Original manuscript received: 28 February 2012
  • Meeting paper published: 20 February 2012
  • Revised manuscript received: 3 September 2012
  • Manuscript approved: 10 September 2012
  • Published online: 21 November 2012
  • Version of record: 11 December 2012