Wednesday, 6 October |
|
0815-0945 |
Session I: IntroductionChairs: Tommy Golczynski, Multiphase Solutions; Colin Pickle, Anadarko Petroleum Presentation 1: Multiple Dimensions of Operations Readiness Presentation 2: Planning for Safe, Optimized Well Unloading and Rampup during Startup of an
FPSO-Based Deepwater Project Presentation 3: Overview of Topsides Startup Issues |
1015-1145 |
Session II: Social and Technical IssuesChairs: Jorge Garduno, GATE; Lance Medlin, Griffin Wales Process Management Presentation 1: People Issues at Startup - Things we Should Learn from Social Science Literature Presentation 2: Subsea Commissioning from the Beach Presentation 3: Methanol Induced Headaches at Startup |
1315-1445 |
Session III: Flowback Fluid TreatmentChairs: Dale Landry, Nalco Company; Xandra Turner, CETCO Oilfield Services Presentation 1: Predicting Acid Returns Compositions from Mineralogy Presentation 2: Emulsion Prediction and Treating Presentation 3: Current and Upcoming Challenges for Flow Backs |
1515-1645 |
Session IV: Topsides Equipment Preservation and StartupChairs: Milton Watson, Noble Energy; Greg Reon, Petrobras America Presentation 1: Compressor Commissioning and Condition Monitoring Presentation 2: Integrated Flexible Separation System Lessons Learned from Tahiti Presentation 3: Control Systems Startup and Commissioning |
Thursday, 7 October |
|
0800-0930 |
Session V: Gas Export Line Commissioning and StartupChairs: Mike Stark, Enterprise Products Partners; Siva Subramanian, Chevron ETC Presentation 1: Blind Faith Gas Export Pipeline Pre-Commissioning and Commissioning - Efforts
and Challenges Presentation 2: Independence Trail Gas Export, Challenges of Commissioning the 134 mile Pipeline
in up to 8,000 Feet of Water Presentation 3: Bypass of Inoperable Subsea Valve for Perdido Gas Export Tie-in |
1000-1130 |
Session VI: Subsea and Subsurface EquipmentChairs: David Dutsch, Shell Brazil E&P; Thomas Carter, Marathon Oil Company Presentation 1: Perdido First Oil – Well Unloading Through a Wet Flowline Presentation 2: Subsea System Commissioning and Lessons Learned Presentation 3: BC-10 Subsea Boosting System Commissioning |
1300-1430 |
Session VII: Planning and ProceduresChairs: Rex Spahn, Manatee; John Ford, BHP Billiton Presentation 1: Overview – Startup Planning and Procedures Presentation 2: Use of an Online Monitoring System to Support Commissioning and Startup Presentation 3: Operator Training Simulator for Perdido – Applications and Advances |
1500-1630 |
Session VIII: Lessons Learned Panel DiscussionPanel: Trey Lambert, Deepwater Specialists Inc.; John Occhipinti, CETCO Oilfield Services; Denis Taylor, Audubon Engineering Company; John Waldvogel, Nalco Company Topic 1: Nitrogen/Helium Tightness Testing Topic 2: Heat Medium Startup Topic 3: Topsides Diesel/Dead Oil Circulation Flow Test Topic 4: Methanol/LDHI at Startup Topic 5: Emulsions |