Asia Pacific

SPE logo

Artificial Lift Systems: Get the Maximum from Your Wells

24 – 27 November 2013

Phuket, Thailand | Le Méridien Phuket Beach Resort

As oil and gas fields are depleted, a suitable artificial lift system is required to maintain delivery volumes and to maximise recovery. To handle adverse conditions, such as high viscosity oil, high water cut, sand, low reservoir pressures, high temperatures, low productivity wells and high angle wells, special artificial lift systems may be required. Engineers need to evaluate all of artificial lift system for their reservoirs.

Read more »

Venue

LeMéridien Phuket Beach Resort
29 Soi Karon Nui, Tambon Karon, Amphur Muang,
Phuket 83100, Thailand.
Tel: 66.7637.0100
Fax: 66.7634.0479