United States

SPE logo

Performance and Design of Water Injector Wells Requiring Sand Control

10 โ€“ 12 September 2013

San Diego, California | Bahia Resort Hotel

Injectors with sand control completions have challenges with sustaining injectivity, preventing injector failures, and keeping injection in zone. Numerous and different water injectors with sand control have been installed and injecting in many high-rate projects around the globe.

Read more ยป

Venue

Bahia Resort Hotel
998 W. Mission Bay Drive
San Diego, California 92109
Phone: 858.539.7700

Deadline

Registration deadline is
9 August.