SPE logo

Registration

Accommodations and Travel

Technical Program

Tuesday, 27 November, 1415 –1545

Session 1: Operational Excellence in Artificial Lift

Grand Ambassadors Suite I

Session Chairs: Rashid Al Masfry, Marjan Petroleum; Samer Cheblak, Artificial Lift Company

1415

ESP Installation Best Practices to Minimize ESP Failures
F. Yami, Saudi Aramco

1445

Field Experience to Optimize Gas Lift Well Operations
A. A-Allah, British University in Egypt

1515

Automatic Speed Control and Optimization for Beam Pumps
I. Kamel, Fawares Petroleum Services; N. Sadek, Lufkin Industries

Session 2: Innovative and Emerging Artificial Lift Technologies

Grand Ambassadors Suite II

Session Chair: Alan Petrie, Baker Hughes; Lawrence Camilleri, Schlumberger

1415

Bringing Digital Intelligence to Artificial Gas Lift
I. Anderson, Camcon Oil

1445

Applications of Surface Jet Pumps in Oil and Gas Production Handling Multiphase Flow
N. Beg, S. Sarshar, Caltec

1515

Development of an All New ESP for Rig-less Deployment
N. Liley, Zilift Limited

1615 –1745

Session 3: HSE

Grand Ambassadors Suite I

Session Chairs: Mohamed Afifi, Belayim Petroleum Company; Mahdy Kotb, Alcesp

1615

Barrier Technology
T. White, Schlumberger

1645

ESP Function Test
M. Khalifa, Saudi Aramco

1715

Accelerating Interdependent HSE Culture
Y. Ibrahim, Baker Hughes

Session 4: Well Completion for Artificially Lifted Wells

Grand Ambassadors Suite II

Session Chairs: Abdulhaq Baflah, Al Khorayef Petroleum; Yasser, Gulf Energy

1615

Wet Connect
K. Mohanna, Saudi Aramco

1645

The Evolution of Artificial Lift Completions in an Offshore Brownfield in Malaysia
M. Salim, Schlumberger

1715

High Flow Insertable PCP
R. Hicks, Baker Hughes

Back to the top

Wednesday, 28 November, 0830–1000

Session 5: Surveillance Monitoring and Optmization

Grand Ambassadors Suite I

Session Chairs: El-Sayed Bedair, BAPETCO; Slavoljub Stojanovic, Tatweer Petroleum

0830

Optimization and Diagnosis of Intermittent Well Operation Using Integrated Computer Modeling Solution
M. Solesa, CMS Prodex

0900

How Real-Time Surveillance Improves the ESP Run Life, Uptime and Reduces Production Deferment
M. Abdel-Basset, Schlumberger

0930

A-PAM Methodology
S. Hoyte, GE Energy

Session 6: Design Selection of Optimum Artificial Lift Systems

Grand Ambassadors Suite II

Session Chairs: Mostafa El-Shafei, GE Oil & Gas; Syed A Warsi, Saudi Aramco

0830

Novel Jet-Pump Application Enables Water Flood Project for a Sour Carbonate Reservoir in the Sultanate of Oman
F. Hosni, G. Lanier, Petroleum Development Oman

0900

Design Selection of Optimum Artificial Lift Systems
R. Molotkov, Weatherford

0930

Design and Well Parameters Effects on Run Life of Sucker Rod Pumps (SRP): A Statistical Study for Adiyaman—Turkey
E. Ergun, Turkish Petroleum Corporation

1315–1445

Session 7: Extreme ESP Applications

Grand Ambassadors Suite I

Session Chairs: Khalid Al Araimi, Zenith; Yousry El Sherbeeny, Schlumberger

1315

Improving ESP Performance in High Temperature and High GOR Wells
A. Fastovets, Schlumberger

1345

Performance and Application of Electrical Submersible Pumps Rated to 250⁰C
L. Silverman, Baker Hughes

1415

High Gas-to-Oil Ratio Solutions
K. Saunders, GE Oil and Gas

Session 8: Field Studies and Case Histories

Grand Ambassadors Suite II

Session Chairs: Colin Morrison, Caltec; Faisal Beheir, Saudi Aramco

1315

Large Scale Application of Jet Pump in Onshore Mangala Oil Field
C. Chavan, Cairn India

1345

Some Novel Examples Of The Use Of Surface Jet Pumps (Sjps) To Enhance Production And Processing. Case Histories And Lessons Learned
N. Beg, S. Sarshar, Caltec

1415

Plunger Lifts
H. Al Muqbali, Petroleum Development Oman

1515–1700

Session 9: Alternative Deployment Technologies

Grand Ambassadors Suite I

Session Chairs: Ross Macfadyen, OXY; Ted Boueri, ITT

1515

Alternative Deployment Technology: Gaslift Packoff’s and Coiled Tubing GL
T. White, Schlumberger

1550

Alternative Deployment Technologies
A. Bimani, Petroleum Development Oman

1625

Obtaining Real-Time Flow Rate, Water Cut and Reservoir Diagnostics from ESP Gauge Data
L. Camilleri, Schlumberger

Session 10: Artificial Lift Applications—Beyond the Limit

Grand Ambassadors Suite II

Session Chairs: Falah Al Yami, Chevron; Yanni Wahba, SERCEL-GRC CORP

1515

Wellhead Compression: Enhanced Recovery of Mature Gas Fields by Lowering FWHP
M. Ahmed, Siemens

1550

Replacing ESP and Gas Lift with ESTSP (Electric Submersible Twin Screw Pumps)-Multiphase
D. MacNeil, Talisman; P. Dass, CAN-K Group

1625

High Rate ESP Application in Onshore Rajasthan Fields: A Case Study
C. Chavan,  M. Jha, Cairn India

Back to the top

Tuesday, 27 November–Wednesday, 28 November, 0900–1730

Poster Session

 

A New One-Dimensional Flow Theory of the Jet Pump for Pumping Crude Oil with Different Viscosities and Densities Using Water Powered Flow
H. Abdou, Agiba Petroleum

 

Exploring the Interaction Between Artificial Lift Operations and HSE Practices
K. Fayoumi, Schlumberger

 

Foamer Application for Sajaa Asset Wells, Petrofac and Baker Hughes
B. Poulose, Petrofac; M. Al Hamadi, Baker Hughes

 

Multistage Centrifugal Surface Pumps for Boiler Feed — A Simple Solution
D. Berry, Baker Hughes

 

Optimising an Artificially Lifted Reservoir Using Real Time Information
J. Cudmore, ZENITH

 

Performance and Application of Electrical Submersible Pumps Rated to 250⁰C
L. Silverman, W. Milne, Baker Hughes

 

Remedying Dying Wells In Pakistan-An Exclusive Case Study
B. Haider, Weatherford Oil Tool Ltd

 

Subsurface Chemical Delivery System
D. Earnest, M. Lowe and W. A. Elhag, Odessa Separator

 

Through Tubing Deployed Slick line Retrievable ESP System
S. Cheblak, Artificial Lift Company

 

Well Completion for Artificial Lift Wells: Gaslift (Schlumberger XLift Technology)
N. Manuel, Schlumberger

Back to the top