Tuesday, 27 November, 1415 –1545
Session 1: Operational Excellence in Artificial Lift
Grand Ambassadors Suite I
Session Chairs: Rashid Al Masfry, Marjan Petroleum; Samer Cheblak, Artificial Lift Company |
1415 |
ESP Installation Best Practices to Minimize ESP Failures
F. Yami, Saudi Aramco |
1445 |
Field Experience to Optimize Gas Lift Well Operations
A. A-Allah, British University in Egypt |
1515 |
Automatic Speed Control and Optimization for Beam Pumps
I. Kamel, Fawares Petroleum Services; N. Sadek, Lufkin Industries |
Session 2: Innovative and Emerging Artificial Lift Technologies
Grand Ambassadors Suite II
Session Chair: Alan Petrie, Baker Hughes; Lawrence Camilleri, Schlumberger |
1415 |
Bringing Digital Intelligence to Artificial Gas Lift
I. Anderson, Camcon Oil |
1445 |
Applications of Surface Jet Pumps in Oil and Gas Production Handling Multiphase Flow
N. Beg, S. Sarshar, Caltec |
1515 |
Development of an All New ESP for Rig-less Deployment
N. Liley, Zilift Limited |
1615 –1745
Session 3: HSE
Grand Ambassadors Suite I
Session Chairs: Mohamed Afifi, Belayim Petroleum Company; Mahdy Kotb, Alcesp |
1615 |
Barrier Technology
T. White, Schlumberger |
1645 |
ESP Function Test
M. Khalifa, Saudi Aramco |
1715 |
Accelerating Interdependent HSE Culture
Y. Ibrahim, Baker Hughes
|
Session 4: Well Completion for Artificially Lifted Wells
Grand Ambassadors Suite II
Session Chairs: Abdulhaq Baflah, Al Khorayef Petroleum; Yasser, Gulf Energy |
1615 |
Wet Connect
K. Mohanna, Saudi Aramco |
1645 |
The Evolution of Artificial Lift Completions in an Offshore Brownfield in Malaysia
M. Salim, Schlumberger |
1715 |
High Flow Insertable PCP
R. Hicks, Baker Hughes |
Back to the top |
Wednesday, 28 November, 0830–1000
Session 5: Surveillance Monitoring and Optmization
Grand Ambassadors Suite I
Session Chairs: El-Sayed Bedair, BAPETCO; Slavoljub Stojanovic, Tatweer Petroleum |
0830 |
Optimization and Diagnosis of Intermittent Well Operation Using Integrated Computer Modeling Solution
M. Solesa, CMS Prodex |
0900 |
How Real-Time Surveillance Improves the ESP Run Life, Uptime and Reduces Production Deferment
M. Abdel-Basset, Schlumberger |
0930 |
A-PAM Methodology
S. Hoyte, GE Energy |
Session 6: Design Selection of Optimum Artificial Lift Systems
Grand Ambassadors Suite II
Session Chairs: Mostafa El-Shafei, GE Oil & Gas; Syed A Warsi, Saudi Aramco |
0830 |
Novel Jet-Pump Application Enables Water Flood Project for a Sour Carbonate Reservoir in the Sultanate of Oman
F. Hosni, G. Lanier, Petroleum Development Oman |
0900 |
Design Selection of Optimum Artificial Lift Systems
R. Molotkov, Weatherford |
0930 |
Design and Well Parameters Effects on Run Life of Sucker Rod Pumps (SRP): A Statistical Study for Adiyaman—Turkey
E. Ergun, Turkish Petroleum Corporation |
1315–1445
Session 7: Extreme ESP Applications
Grand Ambassadors Suite I
Session Chairs: Khalid Al Araimi, Zenith; Yousry El Sherbeeny, Schlumberger |
1315 |
Improving ESP Performance in High Temperature and High GOR Wells
A. Fastovets, Schlumberger |
1345 |
Performance and Application of Electrical Submersible Pumps Rated to 250⁰C
L. Silverman, Baker Hughes |
1415 |
High Gas-to-Oil Ratio Solutions
K. Saunders, GE Oil and Gas |
Session 8: Field Studies and Case Histories
Grand Ambassadors Suite II
Session Chairs: Colin Morrison, Caltec; Faisal Beheir, Saudi Aramco |
1315 |
Large Scale Application of Jet Pump in Onshore Mangala Oil Field
C. Chavan, Cairn India |
1345 |
Some Novel Examples Of The Use Of Surface Jet Pumps (Sjps) To Enhance Production And Processing. Case Histories And Lessons Learned
N. Beg, S. Sarshar, Caltec |
1415 |
Plunger Lifts
H. Al Muqbali, Petroleum Development Oman |
1515–1700
Session 9: Alternative Deployment Technologies
Grand Ambassadors Suite I
Session Chairs: Ross Macfadyen, OXY; Ted Boueri, ITT |
1515 |
Alternative Deployment Technology: Gaslift Packoff’s and Coiled Tubing GL
T. White, Schlumberger |
1550 |
Alternative Deployment Technologies
A. Bimani, Petroleum Development Oman |
1625 |
Obtaining Real-Time Flow Rate, Water Cut and Reservoir Diagnostics from ESP Gauge Data
L. Camilleri, Schlumberger |
Session 10: Artificial Lift Applications—Beyond the Limit
Grand Ambassadors Suite II
Session Chairs: Falah Al Yami, Chevron; Yanni Wahba, SERCEL-GRC CORP |
1515 |
Wellhead Compression: Enhanced Recovery of Mature Gas Fields by Lowering FWHP
M. Ahmed, Siemens |
1550 |
Replacing ESP and Gas Lift with ESTSP (Electric Submersible Twin Screw Pumps)-Multiphase
D. MacNeil, Talisman; P. Dass, CAN-K Group |
1625 |
High Rate ESP Application in Onshore Rajasthan Fields: A Case Study
C. Chavan, M. Jha, Cairn India |
Back to the top |
Tuesday, 27 November–Wednesday, 28 November, 0900–1730
Poster Session |
|
A New One-Dimensional Flow Theory of the Jet Pump for Pumping Crude Oil with Different Viscosities and Densities Using Water Powered Flow
H. Abdou, Agiba Petroleum |
|
Exploring the Interaction Between Artificial Lift Operations and HSE Practices
K. Fayoumi, Schlumberger |
|
Foamer Application for Sajaa Asset Wells, Petrofac and Baker Hughes
B. Poulose, Petrofac; M. Al Hamadi, Baker Hughes |
|
Multistage Centrifugal Surface Pumps for Boiler Feed — A Simple Solution
D. Berry, Baker Hughes |
|
Optimising an Artificially Lifted Reservoir Using Real Time Information
J. Cudmore, ZENITH |
|
Performance and Application of Electrical Submersible Pumps Rated to 250⁰C
L. Silverman, W. Milne, Baker Hughes |
|
Remedying Dying Wells In Pakistan-An Exclusive Case Study
B. Haider, Weatherford Oil Tool Ltd |
|
Subsurface Chemical Delivery System
D. Earnest, M. Lowe and W. A. Elhag, Odessa Separator |
|
Through Tubing Deployed Slick line Retrievable ESP System
S. Cheblak, Artificial Lift Company |
|
Well Completion for Artificial Lift Wells: Gaslift (Schlumberger XLift Technology)
N. Manuel, Schlumberger |
Back to the top |