Technical Program

Tuesday, 26 August

0900-1030

Lotus Suite 5 & 6

Technical Session: Drilling Fluids

Session Chairpersons:

Ronald Bland, Baker Hughes; Assanee Meeponsom, Chevron Thailand E&P

Time Paper # Presentation
0900-0922 170557 icon:DC Novel Drilling Fluids Enable Record High-Temperature, Deep-Gas Exploration Well Offshore Peninsula of Malaysia
A. Witthayapanyanon, Baker Hughes; K. Nasrudin, F. Wahid, M.M. Pepple, M. Abshar, PETRONAS Carigali Sdn. Bhd.; A.B. Dollah, K. Chandramouleeswaran, A. Kongsawast, R.G. Bland, D.K. Clapper, Baker Hughes
0922-0944 170514 icon:DC Meeting Drilling Fluid Challenges in Gulf of Thailand Ultra High Temperature Exploration Wells
K. Charnvit, F. Huadi, C. Promkhote, C. Aldea, D. Power, M-I SWACO; N. Kongpat, G. Segret, PTT Exploration and Production Plc.
0944-1006 170525 icon:DC Improving Drilling Economics through Drilling Fluids and Solids Control in the Eagle Ford - Case Examples and Results
Q. Guo, Y. Wang, O. Deplaude, G. Fout, M-I SWACO
1006-1030 170528 icon:RDD Designing and Running a Special Oil-Based Mud for a North Sea HPHT Campaign
M. Kabanov, E. Telford, C. Gray, Baker Hughes
Alternate 170550 icon:DC Novel Lubricant - Bridging Agent Combination Cures Differential Sticking Problems in High Pressured North Kuwait Wells
A. Rajagopalan, M.S. Al-Mehailan, S.M. Jumah, A. Debroy, Kuwait Oil Co.; M.A. Elkhair, P. McNaughton, Halliburton
Tuesday, 26 August

0900-1030

Lotus Suite 11

Technical Session: Managed Pressure Drilling and Real-Time Operations

Session Chairpersons:

Fredric Young, Dalma Energy & Co. LLC; David Johnson, Mubadala Petroleum

Time Paper # Presentation
0900-0922 170554 icon:DC Optimising Well Design in Saudi Arabia: Successful Application of Managed Pressure Drilling Enables Drilling Across Multiple Pressure Zones and Running Liner Using Constant Bottom Hole Pressure Technique
N.O. Pinero Zambrano, I.M. Al-Ageel, M.A. Muqeem, A.S. Al Mutawa, Saudi Aramco; M.C. Mazouz, Weatherford Gemoco; A. Hadj-moussa, Precision Energy Services; A. Zeb, Weatherford; F.H. AlGhamdi, Weatherford Saudi Arabia
0922-0944 170523 icon:DC Abandonment of 19 Subsea Wells in the Jabiru/Challis Fields
I. Clyne, N. Jackson, PTTEP Australasia Pty. Ltd.
0944-1006 170535 icon:PO A More Advanced Multistage Completion System for Fracturing
H. Wibowo, S. Gaudette, N. Carrejo, Baker Hughes
1006-1030 170542 icon:RDD LPG-Based Fracturing: An Alternate Fracturing Technique in Shale Reservoirs
T.M. Soni, Pandit Deendayal Petroleum U.
Alternate 170471 icon:DC Highest Reliability Provides a World Class Benchmark for Permanent Downhole Monitoring Installation and Data Delivery in Malaysia
O.B. Samuel, PETRONAS; M. Khalid, PETRONAS Carigali Sdn. Bhd.; I. Raw, Schlumberger WTA Malaysia Sdn. Bhd.; P.K. Kaka Singh, Schlumberger WTA Malaysia Sdn Bhd
Alternate 170470 icon:PO A New Approach to Wellbore Sand Cleanout Using Electric-Line Technology
H.T. Giang, C.D. Trung, Japan Vietnam Petroleum Co. Ltd.; J.P. Nayak, Welltec
Tuesday, 26 August

0900-1030

Lotus Suite 7

Technical Session: Innovative Technologies

Session Chairpersons:

Jirapong Dharaphop, PTT Exploration and Production Plc.; Wade Rebardi, Superior Energy Services

Time Paper # Presentation
0900-0922 170569 icon:DC Disappearing Tubing Hanger Plug (DTHP) Improves Well Integrity and Saves Rig Time for Deepwater Well Completions
S. Sevatdal, TCO; R. Chaanani, Total; C. Koay, TCO
0922-0944 170545 icon:DC Innovative Cement Spacer Improves Well Cementing Integrity - 60 Case Histories Reviewed
A. Budiawan, H. Shahabadi Farahani, A. Anugrah, A. Brandl, Baker Hughes; D. Indro Pratomo, Pertamina
0944-1006 170565 icon:RDD Open Hole Tractor and High Tension Conveyance Package Reduces HSE Risk and Saves Three Days of Rig Time for Formation Fluid Sampling in a Highly Deviated Well
A. Hermes, Schlumberger; M. Akue, F. Delaval, L. De Crevoisier, Perenco; S.A. Sarian, P. Bozzolan, Y.A. Tchieji, M.J. Andrew, K. Bahmudov, M.W. Reid, Schlumberger
1006-1030 170463 icon:DC A Quasi Intelligent Flow Control Device for Water Injectors
E.G. Bowen, Superior Completion Services; B.S. Aadnoy, U. of Stavanger
Alternate 170493 icon:PFC The Central Mud Recycling Plant: A Green and Cost Effective Initiative in the Brown Fields of Mehsana Asset
G. Dixit, K.C. Sharma, A.K. Srivastava, P.C. Ranowt, N.G. Mandal, Oil and Natural Gas Corp. Ltd.
Alternate 170510 icon:PO Ultra-Lightweight (ULW) Proppants: A New Dimension in Completion Technology
V.K. Baskaran, K. Dani, D. Gupta, K.P. Kumar, A. Urkude, U. of Petroleum & Energy Studies
Alternate 170516 icon:DC Potentiality for Pre-Well Planning in Development Field - The Next Step to Reducing Time and Enhancing Well Planning by Collaboration Drilling’s and Geoscience's Workflow - Case Study: Development Field in Gulf of Thailand
K. Boonsri, PTT Exploration and Production Plc.; J. Natepracha, Halliburton Energy Services Co.
Tuesday, 26 August

1400-1530

Lotus Suite 5 & 6

Technical Session: Intervention and Stimulation

Session Chairpersons:

Steve McBride, Weatherford; Joel Rignol, PTT Exploration and Production Plc.

Time Paper # Presentation
1400-1422 170558 icon:PO First Conformance System to Fix Leaking Downhole Packer and Enhance Hydrocarbon Production in Gulf of Thailand
R. Wattanasuwankorn, V. Limniyakul, T.J. Dunlop, Halliburton Energy Services Inc.; W. Chayraksa, Chevron Offshore Thailand Ltd
1422-1444 170511 icon:PO Best Practice in the First Wireline Retrievable ESP Pilot Job in Kuwait
M. Bouhanna, M. Al-Shammari, A. Al-Fadli, P. Mali, A. Al-Jasmi, Kuwait Oil Co.
1444-1506 170551 icon:PO Unlocking Marginal Field Potential via Fiber Optic Enabled Coiled Tubing Integrated Solutions
M. M. Mokhtar, M. Yaakub, PETRONAS Carigali Sdn. Bhd.; S. Mustaffa, PETRONAS Carigali Sdn Bhd; A.H. Keong, Schlumberger; M. Kasim, Dowell Schlumberger; D.A. Wijoseno, Schlumberger
1506-1530 170487 icon:PO Milling Casing Exit Windows from a Hydraulic Workover Unit at Small Footprint Platform
S. Cham, C. Hogg, R. Wibisono, R. Barker, R. Stutts, Weatherford International
Alternate 170490 icon:HSE The Application of Recyclable Fracturing Fluid in Changqing Oilfield
L.j. Liao, CCDC Changqing Downhole Technology Co., PetroChina; Y.l. Chen, N. Li, M. Zhang, Z.w. Wang, CCDC Changqing Downhole Technology Co.,PetroChina; N. Li, CCDC Changqing Downhole Technology Co., PetroChina
Alternate 170489 icon:PO First Achievement Using Water Shutoff Polymer in Monobore Well Completion, Gulf of Thailand
R. Wattanasuwankorn, Halliburton Energy Services Group; N. Jiemsawat, Halliburton Energy Services Inc.,; T. Dunlop, Halliburton; S. Kanchiak, Chevron Thailand Exploration and Production
Tuesday, 26 August

1400-1530

Lotus Suite 11

Technical Session: Case Studies

Session Chairpersons:

David Chen, Hess EPT Well Technology; Basker Murugappan, Taqa Global

Time Paper # Presentation
1400-1422 170486 icon:DC Integrated Drilling Breakthroughs Enable More Efficient Development in the Most Challenging Ultra-deep Formations in Tarim Basin, West China
X. Teng, China U. of Petroleum, Beijing; N. Li, B. Zhou, J. Li, Tarim Oilfield Co., PetroChina; R. Cheng, X. Yuan, CNPC Drilling Research Inst.; M. Chen, China U. of Petroleum, Beijing
1422-1444 170475 icon:DC Achieving Top Quartile Extended Reach Performance in the North Malay Basin
T. Richardson, S. Jong, T. Rosli, W. Scott, Hess; R.B. Lamothe, D.C. Chen, Hess Corp.
1444-1506 170562 icon:DC Gulf of Thailand Case Study: Improving Zonal Isolation With an Advanced Yet Simplified Cementing System
N.N. Rivera, K. Siritheerasas, Chevron Thailand E&P; V. Valentino, G. Fauchille, A. Thein, R. Stanley, A. Brandl, Baker Hughes
1506-1530 170540 icon:RDD Self-Powered Intelligent Data Retrieval Gauge for Unconventional Well Testing Using DFIT Technology
T. Karaman, Halliburton; N. Waldman, Halliburton Oman; A.E. Swartley, Halliburton Energy Services Inc.; D. Tompkins, Halliburton; M. Redman, Halliburton Energy Services Inc.
Alternate 170501 icon:DC Combating Severe Losses and Improving Cementing Quality in Carbonate Formations: A Lesson Learned from Drilling Wells in Offshore Sarawak, Malaysia
A. Brandl, R. Mohd Hafizzudin, A. Mohd Mahaiyudin, Baker Hughes
Alternate 170474 icon:PO Using E-Line to Restore Well Injection on a Limited Space Platform - A Case Story from India
J.P. Nayak, Welltec A/S; A. Parasher, S. Anand, A. Sharma, Cairn India Ltd.; T. Pinto, Welltec A/S