Business and Technology Innovation to Ensure Sustainable Energy
0900 to 1000Cendrawasih Room Opening Ceremony
|
|
1030 to 1230Cendrawasih Room Executive Plenary SessionChairperson:Wibowo Suseno Wirjawan, Deputy of Finance, BPMIGAS Moderators:Ahmad Yuniarto, Chairman, Schlumberger Speakers:
|
|
1400 to 1600Panel Session 1: Attracting Investment in a Competitive EnvironmentSession Co-Chairpersons: Gunawan Sutadiwira, Vice President,
Exploitation Management, BPMIGAS Speakers:
|
|
1400 to 1600Merak Room 2 Session 1: IOR/EOR ISession Chairpersons: Wisup Bae, Sejong U.; D.M. Anwar Ibrahim Raja, Petro Malaysia Sdn. Bhd. |
|
147872 |
Development of Isotherm Polymer/Surfactant
Adsorption Models in Chemical Flooding |
147937 |
Impact Electrical Surface Charges and Cation Exchange
on Oil Recovery by Low Salinity Water |
143570 |
Smart EOR Screening, Breaching the Gap between Analytical
and Numerical Evaluations |
145096 |
A Practical Compositional Method for Simulation of
CO2 Flooding in
Porous and Fractured Petroleum Reservoirs |
145733 |
Heavy Oil Recovery by Steam Injection, Mapping of Temperature
Distribution in Light of Heat Transfer Mechanisms |
Poster/Alternate |
|
142288 |
Synthesis of Wax Inhibitor and Assessment of Squeeze
Technique Application for Malaysian Waxy Crude |
1400 to 1600Merak Room 3 Session 2: Drilling Tools and Drilling PracticesSession Chairpersons: Rami Fakhry, Schlumberger; Henrik Rasmussen, M.I. Drilling Fluids (M) Sdn. Bhd |
|
145404 |
Advanced Technologies and Practical Guidelines for
Challenging Drilling Applications |
145987 |
Ten Year Evolution and Field History of Design Changes
for a Torque and Drag Reduction Performance Drilling Sub |
139873 |
Solving Deep, Hard/Abrasive 16" Application Challenges
with New PDC Technology Saves Operator 13 Days Rig Time, Kuwait |
145980 |
Downhole Matched Solutions: Innovative Scientific Approach
to More Efficient Assemblies |
145864 |
Dual Eccentric Reamer BHA Solves Hole Opening Challenges
and Conductor Sharing Pass through Constraints |
Posters/Alternates |
|
147859 |
Middle East Case-Study Review of a New Free-Pipe Log
for Stuck-Pipe Determination and Pipe-Recovery Techniques |
141988 |
Stick Slip Mitigation Plan to Improve Drilling |
1400 to 1600Nuri Room 1 Session 3: Field DevelopmentSession Chairpersons: Sameh Macary, TengizChevrOil; Bayong Wibowo, PT. Chevron Pacific Indonesia |
|
145899 |
An Integrated Pore-Pressure Prediction Approach: A
Success Strategy to Develop Deep Gas Reservoirs by Drilling
through Highly Depleted Shallow Zone, Semberah Field, East Kalimantan,
Indonesia |
145767 |
Utilizing Gross Heating Value Management in Field
Development Planning |
142827 |
Extending the Life of Mature Field by Light Workover
Cementing Technique |
145879 |
Reservoir/Well Production Assurance Strategies for Successful
Field Development Projects |
145483 |
Optimal Placement of
Horizontal Wells in Ultra-high
Resistivity and Stacked Channel
Sandstones: A Case Study from the
Mangala Field, Rajasthan, Western Onshore India |
Poster/Alternate |
|
147828 |
Reservoir Characterisation of Surat Basin Coal Seams
Using Drill Stem Tests |