Technical Programme - Tuesday, 1 March
08:30 to 10:30Auditorium Technical Session 1: Bits and CoringSession Chairpersons: Dan Scott, Baker Hughes; Marcel Boucher, National Oilwell Varco |
||
0830 |
140133 |
Surface Hole Casing While Drilling— a Review
of Five Years Experience in Gabon, West Africa |
| 0900 | 140070 | Maximizing Core Recovery in Lower Tertiary through Drilling
Optimization Service and Intelligent Core Bit Design |
| 0930 | 140353 | Cutting Carbonates — New Technology Delivers Step Changes
in Bit Performance |
| 1000 | 140317 | Extension of Gauge Length to Reduce Vibrations and Improve
Drilling Performance |
1030-1100 |
Coffee Break and Knowledge Sharing ePoster Session 1 | |
1100-1245 |
Plenary Session 1 | |
1330-1400 |
Knowledge Sharing ePoster Session 2 | |
08:30 to 10:30Room F003 Technical Session 2: Deepwater 1Session Chairpersons: Roy Marker, Statoil; Han J Tiebout, SBM Offshore |
||
| 0830 | 140113 | Kick Tolerance Misconceptions and Consequences to Well
Design |
| 0900 | 140326 | Effective BHA Design and Vibration Modelling for Improving
the Quality of Sonic Measurements |
| 0930 | 139410 | A Historical Review of Drill Pipe Capabilities and the
Triggers for Change |
| 1000 | 140144 | Dynamic Aspects Governing Cement Plug Placement in Deepwater
Wells |
1030-1100 |
Coffee Break and Knowledge Sharing ePoster Session 1 | |
1100-1245 |
Plenary Session 1 | |
1330-1400 |
Knowledge Sharing ePoster Session 2 | |
08:30 to 10:30Room F005 Technical Session 3: Tubular 1Session Chairpersons: Thomas Gee, Weatherford International; Michael Jellison, NOV Grant Prideco |
||
| 0830 | 139785 | Fatigue-Based Tubular Connection Performance for a CSS
Operation |
| 0900 | 140262 | Application of a New Method for Predicting Down Hole Loading
of Tubulars during Expansion |
| 0930 | 139762 | Intergranular Cracking of Oil Field Tubular Components
Resulting from the Tempering Process |
| 1000 | 139826 | Breakout Torque: Hypothesis, Investigation, and Evaluation |
1030-1100 |
Coffee Break and Knowledge Sharing ePoster Session 1 | |
1100-1245 |
Plenary Session 1 | |
1330-1400 |
Knowledge Sharing ePoster Session 2 | |
14:00 to 17:30Auditorium Technical Session 4: Completion Technology and Field Development
|
||
| 1400 | 140244 | High Performance Wellbore Departure and Drilling System
for Accessing New Target |
| 1430 | 140228 | Case History: Lessons Learned From Retrieval of Coiled
Tubing Stuck by Massive Hydrate Plug When Well
Testing in an Ultra-Deep Water Gas Well in Mexico |
| 1500 | 140274 | Merging Multilateral and Casing Exit Technologies to Increase
Wellbore Junction Reliability by Reducing Rig
and Openhole Exposure Times |
1530-1600 |
Coffee Break and Knowledge Sharing ePoster Session 3 |
|
| 1600 | 140304 | A Cost-Effective Alternative Method of Deploying Perforating
Devices in High-Angle Wells |
| 1630 | 140010 | Passive Inflow Control Devices and Swellable Packers Control
Water Production in Fractured Carbonate
Reservoir: A Comparison with Slotted Liner Completions |
| 1700 | 139628 | Challenging Multilateral and Completion Design for a Deepwater
Well in Italy: Decision Support through Risk
Analysis |
14:00 to 17:30Room F003 Technical Session 5: Drilling AutomationSession Chairpersons: David Reid, National Oilwell Varco; Mario Zamora, M-I SWACO |
||
| 1400 | 139849 | Real-Time Optimization of Drilling Parameters by Autonomous
Empirical Methods |
| 1430 | 140231 | FMECA and Commissioning ―Guidelines to Effectively Deliver
Technology and Systems for Successful Drilling
Automation |
| 1500 | 139403 | Continuous Motion Rig ― A Detailed Study of a 750 Ton
Capacity, 3600 m/hr Trip Speed Rig |
1530-1600 |
Coffee Break and Knowledge Sharing ePoster Session 3 | |
| 1600 | 139897 | Increased Rate of Penetration through Automation |
| 1630 | 140114 | Interoperability: An Enabler for Drilling Automation and
a Driver for Innovation |
| 1700 | 140255 | Development of an Automated System for the Rapid Detection
of Drilling Anomalies using Standpipe and
Discharge Pressure |
1730-1900 |
Welcome Reception in the Exhibition Hall | |
14:00 to 15:30Room F005 Technical Session 6a: HSE
|
||
| 1400 | 139161 | Psychological effect on HSE behaviour- New initiative
from a Drilling Team |
| 1430 | 138960 | Reducing Safety Incidents by Lifting Single Joints of
Drill Pipe with a New Design of Elevator |
| 1500 | 139845 | Can Safety Improvement Increase Drilling Efficiency? |
1530-1600 |
Coffee Break and Knowledge Sharing ePoster Session 3 | |
16:00 to 17:30Room F005 Technical Session 6b: Case StudiesSession Chairpersons: John L. Thorogood, Drilling Global Consultant; Rolv Rommetveit, eDrilling Solutions |
||
| 1600 | 140331 | Case History of Innovative Plug and Abandonment Equipment
and Processes for Enhanced Safety and Significant Cost Savings |
| 1630 | 140260 | The Successful Evolution of an LWD Rotary Steerable System
for Air Drilling |
| 1700 | 140305 | An Aggressive Approach to Reducing Failure-Driven Non-Productive
Time in Onshore Drilling Operations:
Expanding the Quality Program |
1730-1900 |
Welcome Reception in the Exhibition Hall | |



