SPE International Conference and Exhibition on Formation Damage Control 7 - 9 Feb 2018 Doubletree by Hilton Lafayette Lafayette, Louisiana, USA

Call for Papers

You are invited to share your technical innovations and accomplishments by submitting a paper proposal for consideration. Your submission must be received by Monday, 24 July 2017.

Submission Categories

Formation Damage Attributed to Drilling, Cementing and Perforating Practices      

  • Causes and prevention during drilling, cementing, perforating, remedial operations, and productions
  • Evaluation of formation damage due to casing accessories

Formation Damage in Horizontal/Multilateral Drilling   

  • Method for formation damage remedy and/or increased production
  • Damage characterization
  • Control of damage in horizontal wells and multilateral wells

Damage Attributed to Completion and Workover Fluids

  • Filtration control additives     
  • Surface filtering of fluids
  • Super-clean fluids
  • Clay and iron control
  • Chemical additives (weight and loss circulation materials, gels, diverters, surfactants, preflushes, scale inhibitors, corrosion inhibitors, acid formulations, and afterflushes)
  • Stress corrosion cracking risks of CRA in completion brines

Damage Attributed to Wellbore Fluids

  • Emulsion
  • Reactions with rock
  • Scales formed near the wellbore and in cores
  • Precipitation phase behavior
  • Flocculation, agglomeration, and coagulation of asphaltenes, resins, paraffins, hydrates, and other organic solids

Naturally Occurring  Damage                        

  • Bio-mass, clays, scales, and their sensitivity to reservoir depletion, gas, water shut-off, conformance, and multiphase flow effects
  • Geochemistry/chemistry of damaging materials
  • Fines migration in injection and production wells

Screening Criteria for Completions 

  • Geological and mineralogical classification and distribution
  • Applied NMR methods
  • Fractal simulation
  • Neural network
  • Wellbore stability
  • Subsidence and stress effects

Damage Characterization in Tight Sands and Shale Reservoirs

  • Slickwater stimulation   
  • Water imbibition in shales
  • Wettability
  • Additives in slickwater fracturing
  • Water block
  • Condensate block
  • Frac fluid-induced damage
  • Naturally fractured shale reservoirs
  • Hydraulic fractured shale reservoirs
  • Drilling, completion, and production damage characterization 
Water Control
  • Water control polymers
  • Physical plugging of water producing zones
  • Physical plugging of thief zones in water injection wells
  • Detection of water production profiles in production and injection wells
  • Squeeze cementing
  • Conformance in high angle and horizontal wellbores
  • How to know you need conformance and how to evaluate its effectiveness, a tracer application

Damage Characterization of Injection Wells

  • Emphasis on technical and environmental/legal aspects of injection
  • Conformance
  • Downhole waste injection
  • Optimizing injectivity in injection and disposal wells
  • Field case studies of sand management techniques in injectors
  • Field case studies or field performances of seawater injectors with sand control

Damage Cost Assessment  

  • Decision and risk analysis of stimulation and remedial works
  • Payout and rate of return
  • Economics of re-entry
  • Forecasting techniques
  • Economic and technical effects of efforts to minimize cost of drilling, completions, and operations
  • Case studies

Sand Control and Management      

  • Gravel packing
  • Frac packing
  • High-rate water packs
  • Stand-alone screens
  • Expandable screens
  • Sand consolidation
  • Compaction
  • Transport in horizontal, vertical, and high-angle wells
  • Low frac margin open hole gravel pack
  • High overbalance cased hole fracpacking
  • Zonal isolation
  • Fracturing high-permeability sandstones
  • Predicting the need for sand control
  • Intelligent/Smart completions
  • Comparative field case studies of various sand management techniques
  • Emerging sand management techniques
  • Modeling of sand control treatment

Well Stimulation

  • Novel fluids, tools, and techniques
  • Injectors vs. producers
  • Selective/oriented perforating
  • Acidizing and acid fracturing (acid sludge prevention and acid flowback analysis)
  • Acid diversion
  • Hydraulic fracturing and frac packing (frac fluids, proppants, fluid loss additives, closure stress, embedment, tortuosity, perforations, and relative frac/wellbore orientation) in vertical, high-angle and/or horizontal wells
  • Shale fracturing (slick water, crosslinked polymer, hybrid)
  • Optimizing results of perforations-underbalanced, extreme overbalanced, and remedial cleanup
  • Fluid flowback
  • Proppant flowback
  • Fracture mapping (fracture height and half length)
  • Acoustic damage removal (may fit under novel fluids, tools and techniques)

New Developments and Field Experiences      

  • Cavitation completions
  • Coiled tubing to remove formation damage, for stimulation and for water production control in vertical, high-angle, and horizontal wellbores
  • Damage minimization utilizing underbalanced drilling technique
  • Produced solids and drill cuttings disposal
  • Deepwater completions-prediction and remediation of hydrates, scale, and formation damage problems
  • Production optimization of remediated wells
  • Formation damage issues in HP/HT wells
  • Casing/liner Drilling to minimize formation damage
  • Water treatment/management for shale fracturing
  • Formation damage concerns and remedies relevant to pressure depleted reservoirs

Identifying the Source and Magnitude of Formation Damage

  • New developments and field examples of measuring skin
  • Damage ratio
  • Flow profiles
  • Distributed temperature sensing
  • Downhole videos
  • Advancements in cased-hole logging technology
  • Gravel pack and screen damage and screen cleanup evaluation
  • Problems related to deepwater production

Formation Damage Prevention During Well Intervention Operations                           

Damage Issues in Mature Fields

Damage Problems in High Pressure and High Temperature Wells​​

Submit Now

The submission deadline is Monday, 24 July, 2017.

 

Program Committee 

Author Information

Paper Policies

Submission Guidelines

Sample Abstract (pdf)

Paper FAQs

 

Plagiarism Check

In an effort to further improve SPE’s technical quality standards, all submitted conference papers will be checked for plagiarism.