1430-1600 hoursSession 1: Smart Field and Advanced Process Automation I |
|
156117 |
Moving Towards Intelligent Oil Fields |
156946 |
Towards Next Generation of Smart Fields Using Intelligent
Online Multi-Objective Control |
157228 |
Leveraging Technology Infrastructure and Experience to Enable Upstream Asset Optimization |
Alternate/Poster |
|
156123 |
Advanced Process Control |
1430-1600 hoursSession 2: Production Measurements and Allocation |
|
15440 |
Field Testing of Analytical Techniques for Flow Estimation
and Flow Allocation |
152039 |
Treatment of Temperature and Pressure Profiles Along
the Wellbore to Determine Gas Rate |
154098 |
Production Allocation in Multi-Layers Gas Producing
Wells Using Temperature Measurements With The Application of
Genetic Algorithm |
Alternates/Posters |
|
155002 |
Precision for Bigger Diameters: The World’s First 4
Tube Coriolis Mass Flowmeter |
157283 |
Virtual Flow Meter Pilot Based on Data Validation and
Reconciliation Approach |
153302 |
Oil Flow Rate Prediction by Using Hybrid Stochastic
Particle Swarm Optimisation and Neural Network |
1430-1600 hoursSession 3: Facilities Management |
|
157642 |
Starting up Mega-Projects, Experiences with the Start-Up
of Pearl GTL |
156098 |
Deal With Start Up and Commissioning Threats and Challenges at an Early Stage of the Project for a Successful Handover and Project Completion |
152022 |
Sour Gas Development Project: Balancing Project Schedule
and Cost Ratio |
Alternates/Posters |
|
156085 |
Brownfield Development and Interface with Operation Facilities Without Impacting Project Cost, Schedule and Quality |
154136 |
Performance Modelling of Degraded Compressors and Fault
Diagnostics |
1430-1600 hoursSession 4: Offshore Development and Operations |
|
152096 |
Drilling Fluids Consultation System: Development and
Field Applications |
157218 |
Prevailing Drilling Issues and Well Problems in Qatar
Carbonate Fields |
156601 |
High Rate Sour Gas Wells’ Solids Free CleanOut |
Alternates/Posters |
|
154456 |
A Successful Removal Inorganic Hard Scale Deposits
in an Offshore Pipeline in Gemsa Oil Field, Egypt: Field Study |
157075 |
Optimised Drilling by Improved Well Control Using MPD
in Narrow Pressure Window |
153524 |
Dual-Frequency Severe Slugging in Horizontal Pipeline-Riser
Systems |
1630-1800 hoursSession 5: Process Safety Management |
|
157643 |
Qatar Shell GTL Implementation of Process Safety Management |
157652 |
Process Safety Metrics/KPICs: Practical Application
and Challenges |
156906 |
Where Process Safety Must Move |
Alternates/Posters |
|
156094 |
Safety Management in Oil & Gas Industry‑The How’s and the Why’s |
156118 |
Development and Implementation of HSE Management System |
1630-1800 hoursSession 6: Production Enhancement |
|
152957 |
Optimisation Waterflood and Plan for EOR Stage on Rantau
Structure in North Sumatera Indonesia |
155442 |
An Overview of Emerging Technologies and Innovations
for Tight Gas Reservoir Development |
157459 |
Propellant Treatment to Clean Out Gravel Pack of Idle
Wells |
Alternates/Posters |
|
131267 |
A Review on Utilisation of Cross-linked Polymer Gels
for Improving Heavy Oil Recovery in Turkey |
156131 |
Use of Liquid Resin to Enhance and Maintain Conductivity
in Fractured Wells Shows to be Better than the Use of Curable
Resin Proppant: A Case from Burgos Basin Mexico |
156190 |
Non-Iron Based Composition for In-situ Gelled Acid
System |