[[terms:dst]]

Differences

This shows you the differences between the selected revision and the current version of the page.

terms:dst 2011/07/26 09:21 terms:dst 2012/03/26 09:15 current
Line 1: Line 1:
-=== DST ===  +=== DST === 
- +A procedure to determine the productive capacity, pressure, permeability or extent (or a combination of these) of a hydrocarbon reservoir. While several different proprietary hardware sets are available to accomplish this, the common idea is to isolate the zone of interest with temporary packers. Next, one or more valves are opened to produce the reservoir fluids through the drillpipe and allow the well to flow for a time. Finally, the operator kills the well, closes the valves, removes the packers and trips the tools out of the hole. Depending on the requirements and goals for the test, it may be of short (one hour or less) or long (several days or weeks) duration and there might be more than one flow period and pressure buildup period. 
Drill Stem Test. Drill Stem Test.
 
Not logged in [Read-only] (Click for login information)
terms/dst.txt · Last modified: 2012/03/26 09:15 by Li Xiaojiang