Translations of this page?:
[[terms:extreme_overbalance_perforating]]

Extreme Overbalance Perforating

a method of applying a very high pressure surge to the formation at the instant of perforating. Usually in excess of 1.4 psi/ft. Designed to overcome frac initiation pressure and break down each perf with a very short (<1 m) frac.

 
Not logged in [Read-only] (Click for login information)
terms/extreme_overbalance_perforating.txt · Last modified: 2011/07/26 09:21 (external edit)