Translations of this page?:
[[terms:top_plug]]

Top Plug

in cementing, the last plug pumped in cementing with the two plug system. It isolates the displacement fluid and cement slurry. It helps keep the heavy cement slurry from reversing or U-tubing back into the wellbore while the cement slurry is still unset.

 
Not logged in [Read-only] (Click for login information)
terms/top_plug.txt · Last modified: 2011/07/26 09:21 (external edit)