May 2012: Features
The Post-Macondo World: Two Years After the Spill
Talent & Technology
Assessing the Magnitude and Consequences of Reservoir Souring
R&D Grand Challenges
Management
Opportunity, Challenge Meet on Arctic Horizon
Drillers Find Themselves in a Tricky Spot at the Human/Machine Interface
Guest Editorial
May 2012: Technology
Well Construction
Introduction
Extreme-Environment Cementing in the Schoonebeek Heavy-Oil Field
More-Effective Plug-and-Abandonment Cementing Technique
Cemented-Liner- vs. Openhole-Packer- Completed Tight Gas Horizontal Wells
Intelligent Fields Technology
Intelligent-Field-Infrastructure Adoption: Approach and Best Practices
Closed-Loop Feedback Control for Production Optimization
Real-Time Optimization of a Highly Complex, Integrated Gas System
Multilateral Extended Reach
A Successful World-Record Installation of Multilateral Technology in the North Sea
Pushing the Extended-Reach Envelope: Drilling a Record-Reach Well
Hybrid System Brings Flexibility of CT to Long, Extended-Reach Wells
Deepwater Projects
Overcoming Black Sea Ultradeepwater Drilling Challenges
Efficient Perforation of High-Pressure Deepwater Wells
New Approach to Deepwater-Drilling-Data Analysis Enhances Real-Time Capabilities
May 2012: Departments
SPE News
People
Technology Update
Technology Applications
Comments
President's Column
Company News
Regional Update