JPT
spacer

Vol. 58 No. 2

February 2006

Drilling and Cementing Technology

Through-Tubing Completions Maximize Production

The challenge with through-tubing sidetrack completions has been dealing with small clearances and the lack of ready-made equipment. Over the last 10 years and after more than 450 coiled-tubing (CT) -drilling sidetracks on the North Slope of Alaska, a number of unique completion designs have been developed to maximize production and achieve vertical/zonal isolation.

View a Synopsis of SPE 92392.

This article, written by Assistant Technology Editor Karen Bybee, contains highlights of paper SPE 92392, "Unique 'Through Tubing' Completions Maximize Production and Flexibility," by M.O. Johnson, SPE, and P.G. Hyatt, SPE, BP plc; T.O. Stagg, SPE, Orbis Engineering; and L.L. Gantt, SPE, ConocoPhillips, prepared for the 2005 SPE/IADC Drilling Conference, Amsterdam, 23-25 February. The paper has not been peer reviewed.