JPT
spacer

Vol. 59 No. 6

June 2007

Reservoir Simulation and Visualization

Improved and More-Rapid History Matching With a Nonlinear Proxy and Global Optimization

Generating reservoir-simulation models that match field production data has been a long-time industry challenge. Two workflows are presented for assisting history match. One workflow minimizes the misfit between simulated and historical data with a global optimizer. Another workflow trains a comprehensive nonlinear-proxy model with a small set of numerical simulations from experimental design to reduce the number of numerical simulations.

 

View a Synopsis of SPE 101933 published in JPT.

This article, written by Technology Editor Dennis Denney, contains highlights of paper SPE 101933, “Improved and More-Rapid History Matching With a Nonlinear Proxy and Global Optimization,” by A.S. Cullick, SPE, W.D. Johnson, SPE, and G. Shi, Landmark Graphics, prepared for the 2006 SPE Annual Technical Conference and Exhibition, San Antonio, Texas, 24–27 September.

What do you want to do?

Download the full-length technical paper  Members only; free; limited time

Purchase the full technical paper from the eLibrary.