JPT
spacer

Vol. 59 No. 9

September 2007

Completions Today

Intelligent-Completion Technology in a Triple-Zone Commingled Producer

Many oil fields contain stacked reservoirs, each requiring multiple individual wells for proper and timely depletion. By commingling multiple reservoirs in a single well, the total number of wells required for field development can be reduced, resulting in significant cost savings over conventional development especially in offshore areas. Use of intelligent-completion technology can properly manage the recovery of reserves from each individual zone in a commingled completion.

View a Synopsis of SPE 101021 as published in JPT.

This article, written by Assistant Technology Editor Karen Bybee, contains highlights of paper SPE 101021, “Application of Intelligent-Completion Technology in a Triple-Zone Gravel-Packed Commingled Producer,” by W.R. Brock, SPE, E.O. Oleh, SPE, J.P. Linscott, and S. Agara, SPE, Mobil Producing Nigeria, prepared for the 2006 SPE Annual Technical Conference and Exhibition, San Antonio, Texas, 24–27 September.

What do you want to do?

Download the full-length technical paper  Members only; free; limited time

Purchase the full technical paper from the eLibrary.