
Registration
Advance registration is now closed. Please register on site during the following times:
Monday: 1500 - 1800
Tuesday: 0700 - 1800
Wednesday: 0730 - 1700
Thursday: 0730 - 1400
| Session Chairpersons: | Howard Garig, ExxonMobil Graham Mensa-Wilmot, Chevron |
| 0800 | 112765 | Barnett Shale Drilling and Geological Complexities-Advanced
Technologies Provide The Solution S.S. Janwadkar, S. Morris, M. Thomas, Baker Hughes; G. Jackson, G.K. Roberts, D. Fortenberry, M. Kramer, D. Dennie, Devon Energy |
| 0830 | 111874 | Drilling Difficult Formations Efficiently With the Use of an
Antistall Tool K.S. Selnes, StatoilHydro; C. Clemmensen, Halliburton; N. Reimers, Tomax |
| 0900 | 112744 | Offshore Field Test of a New Integrated System for Real-Time
Optimization of the Drilling Process F.P. Iversen, E. Cayeux, E.W. Dvergsnes, R. Ervik, M. Byrkjeland, International Research Institute of Stavanger; M. Welmer, National Oilwell Varco; A. Torsvoll, M. Balov, E. Haugstad, StatoilHydro; A. Merlo, ENI |
| 0930 | 112650 | Drilling Vibrations Modeling and Field Validation J.R. Bailey, E. Biediger, V. Gupta, D. Ertas, W.C. Elks, F.E. Dupriest, ExxonMobil |
| Unassigned | ||
| 112733 | New-Generation PDC Bits Allow Drilling at Record Rates of
Penetration and Increased Durability in Challenging Algerian
Applications E. Aliko, T. Hunt, M. George, J. Nicol, Hughes Christensen |
|
| Session Chairpersons: | Gregory Gill, ConocoPhillips Marianne Stavland, Baker Oil Tools |
| 0800 | 112661 | Present and Future Well Intervention on Subsea Wells S.N. Jossang, R. Friedberg, P. Buset, B. Gramstad, Island Offshore Subsea |
| 0830 | 112648 | Surface BOP Operations From a Multi-Service Vessel C. Johnston, Helix Energy Solutions |
| 0900 | 112638 | The Use of Multilateral Well Designs for Improved Recovery in Heavy
Oil Reservoirs S.R. Fipke, Halliburton; A. Celli, Petrozuata |
| 0930 | 112774 | Cementless Multi-Zone Horizontal Completion Yields Three-Fold
Increase B.D. Maddox, M. Wharton, ECA Holdings; R.L. Hinkie, B.P. Balcer, M. Farabee, Halliburton; J.W. Ely, Ely & Associates |
| Unassigned | ||
| 112701 | Cement Slurry Performance and Set Cement Properties vs. Microsilica
Densification F. Daou, B.M. Piot, Schlumberger |
|
| Session Chairpersons: | Ronald Bland, Baker Hughes |
| 0800 | 112629 | Investigation of Factors for Strengthening a Wellbore by Propping
Fractures M. Wang, M.Y. Soliman, Halliburton; B.F. Towler, University of Wyoming |
| 0830 | 112528 | An Innovative Fluid Pressure Transmission Pill Successfully Used
During Managed-Pressure Drilling Operations in an HP/HT
Environment E. Ronaes, O.I. Prebensen, R. Mikalsen, M-I SWACO; K. Taugbol, S. Syltoy, S. Torvund, StatoilHydro |
| 0900 | 112645 | A Novel Heat-Activated RSF to Treat Severe Cases of Lost
Circulation: Case Histories From Mexico G. Tirado, C. Pliego, A. Rendon, Pemex; I. Fowler, J. Marin, H. Ramirez, E. Soriano, Halliburton |
| 0930 | 112656 | Method To Eliminate Lost Returns and Build Integrity Continuously
With High-Filtration-Rate Fluid F.E. Dupriest, M.V. Smith, S.C. Zeilinger, N. Shoykhet, ExxonMobil |
| Unassigned | ||
| 112595 | Particulate Based Loss-Prevention Material-The Secrets of Fracture
Sealing Revealed! N.M. Kageson-Loe, M.W. Sanders, F. Growcock, M-I SWACO; K. Taugbol, P. Horsrud, A.V. Singelstad, T. Omland, StatoilHydro |
|
| Moderators: | Paul Goodfellow, Regional Wells Manager - Americas Shell E&P Americas |
Spiraling costs of oilfield services, excessive downtime, high dayrates, shortages of equipment, services, people, etc. comments that are heard throughout our industry every day, both by the operators and service providers. What has been the impact of these accelerating costs on drilling activity, marginal assets and production, even during a healthy commodity price environment and will they continue to increase? Are we currently in a stable situation between demand and supply quality and quantity?
In this plenary session, we will present and discuss the impact of these cost increases throughout the supply chain. As an industry, are we concerned simply with costs or does the service quality level associated with those costs have a more significant impact? We will also present and discuss the broader issues that have influenced the increase in costs for drilling, producing, construction, services and manpower and ask what are the solutions. Does technology have a role to play or do we simply need to get supply and demand back in balance after a period of increasing demand and a lagging supply situation.
| Panelists: | William Coates, President North America, Schlumberger Michael Holly, Executive Vice President, Celerant Consulting Stuart Ferguson, Senior VP & Chief Technology Officer, Weatherford International Kevin Neveu, CEO, Precision Drilling Corporation Kevin Carey, General Manager - Deepwater & Complex Wells, Chevron |
| Session Chairpersons: | Cheryl Stark, BP John De Wardt, De Wardt & Company |
| 1400 | 112736 | Building a Well-Control Culture With WellCAP S.M. Kropla, International Association of Drilling Contractors; O.A. Kelly, T. Gillis, P. Sonnemann, Chevron; J.J. Metcalf, Newfield Exploration; O.L.A. Santos, Petrobras; R. Rodrigues, Transocean |
| 1430 | 112764 | Using the Last Several Years of QHSE Data To Improve the Next
Several Years of QHSE Performance R.E. McClaine, Hercules Offshore; J. Stough, Syntex Management Systems |
| 1500 | 112341 | Safe, Effective, and Trouble-Free Rig Startups-Chance or Good
Planning? D. Cormack, R. Richardson, T. Steel, R. Watkiss, KCA DEUTAG |
| 1600 | 112566 | Accelerated Training and Competency Program P. Tinchon, Pride International |
| 1630 | 112496 | H.S.E. Culture-One From Many D.A. Crochet, R.E. McClaine, Hercules Offshore; K.S. Callen, Performance Coaching International |
| 1700 | 112368 | Tar Sands Drilling Waste Management-A Clean Solution C. Nilsen, K.L. McCosh, M. Kapila, M-I SWACO |
| Unassigned | ||
| 111490 | Case Study: Hot Work Control and Safe Work Practices at Oil and Gas
Production Wells J.A. Banks, US Chemical Safety Board |
|
| 112396 | Safety and Maintenance-Benefits of Applying Them
Together M.D. Lanza, San Antonio Internacional |
|
| 112535 | Well-Integrity Issues Offshore Norway B. Vignes, Petroleum Safety Authority; B.S. Aadnoy, University of Stavanger |
|
| Session Chairpersons: | Robert Mitchell, Halliburton Bob Warren, Pride International |
| 1400 | 111511 | Effects of Boundary Conditions and Friction on Static Buckling of
Pipe in a Horizontal Well G. Gao, Chevron; S. Miska, University of Tulsa |
| 1430 | 112547 | Development of Gas Tight, Pressure-Rated, Third-Generation
Rotary-Shouldered Connection for 20,000-psi Internal and 10,000-psi External
Pressure Service J.N. Brock, M.J. Jellison, A. Muradov, Grant Prideco; B.J. Vinson, Sub Surface Tools |
| 1500 | 112624 | Analysis of Control Lines Strapped to Tubing R.F. Mitchell, Halliburton; S.T. Ellis, G. Siappas, A. Colyer, Chevron |
| 1600 | 112678 | What Really Happens to High-Strength Drillpipe When Taking a
Sour-Gas Kick? H.F. Spoerker, W. Havlik, OMV Exploration/Production; M.J. Jellison, Grant Prideco |
| 1630 | 112105 | Connection Fatigue Index (CFI): An Engineered Solution for
Connection Selection and a Replacement for BSR S.E. Ellis, T. Wadsworth, K. Lee, M. Gerdes, S. Altizer, T H Hill Associates |
| 1700 | 112740 | Evolution of Drilling Programs and Complex Well Profiles Drive
Development of Fourth-Generation Hardband Technology A. Chan, D. Hannahs, M.J. Jellison, Grant Prideco; M. Breitsameter, D. Branagan, The NanoSteel Company; H. Stone, Noble Drilling Corporation; G. Jeffers, Nabors Drilling USA |
| Unassigned | ||
| 112587 | Latest Developments and New Technology for Coiled-Tubing
Sidetracking Applications G.L. Garfield, G. Mackenzie, Baker Oil Tools |
|
| 111243 | Analysis of Casing-Shift Problems in Compacting
Reservoirs Y. Jinnai, N. Morita, Waseda University |
|
| Session Chairpersons: | Dominique Dupuis, Pride Forasol Robert Urbanowski, Grey Wolf Drilling Company |
| 1400 | 112312 | New Large Capacity Compact Drawworks for New Builds and Upgrade
Jobs H. Kverneland, M.M. Moe, A. Austefjord, A. Kyllingstad, National Oilwell Varco |
| 1430 | 112869 | Dual Activities Without the Second Derrick-A Success
Story T. Webb, K. Selamat, Murphy Sabah Oil Company; B. Fletcher, Seadrill |
| 1500 | 112584 | Full Field Development of a Remote Oilfield in East Siberia With 4
Rigs Simultaneously Delivers Field Record in Drilling M.L. Drnec, Schlumberger |
| 1600 | 112637 | Novel Automation Interface Improves Drilling Efficiency and
Reliability F. Florence, M. Guggari, W.L. Koederitz, H. Rodriguez, National Oilwell Varco; C. O Kelly, D. Russell, Schlumberger |
| 1630 | 111757 | Development and Testing of a Rig-Based Quick Event Detection System
to Mitigate Drilling Risks W.D. Aldred, R. Hutin, J.C. Luppens, G.M. Ritchie, Schlumberger |
| 1700 | 112743 | Reducing Equipment Integration Cost and Risk in New Rig
Construction D. Reid, J. Hoeflich, J. Ogg, National Oilwell Varco |
| Unassigned | ||
| 112565 | Automated Real-Time Hookload and Torque Monitoring R.J. Kucs, H.F. Spoerker, OMV Exploration/Production; G. Thonhauser, University of Leoben; P. Zoellner, TDE |
|
| 112564 | Ad- Equation Between a Second Generation Semi and Drilling
Extended-Reach Well in Tunisia D.C. Dupuis, Pride Forasol; S. Hancock, BG International |
|