Reviving Europe’s Largest Onshore Field

Europe’s largest onshore oil field, the Patos-Marinza in southern Albania, has been given a new lease on life after seeing production soar from 600 B/D just over a decade ago to more than 20,000 B/D this year. The field’s sole operator, Canadian-based Banker’s Petroleum, set up shop in the country in 2004 and has also more than doubled the estimated reserves from 98 million BOE to 220 million BOE. The Patos-Marinza, which holds an estimated 5 billion bbl of oil in place, has undergone a transformation from a heavily polluted oil field with outdated technology to one that exemplifies modern operations and environmental practices.
Chris Thompson, a production engineering manager at Banker’s, said the company has deployed a number of strategies to achieve its production goals. They include the wholesale replacement of existing artificial lift systems, infill drilling with horizontal wells, and the recent initiation of enhanced oil recovery (EOR) pilot programs using polymer and waterflooding. “With the way the field is set up, there seems to be unlimited opportunities,” Thompson said.
From the onset, Banker’s strategy has centered on introducing Albania to heavy oil engineering expertise and modern technologies from Alberta, Canada. Though similar in some ways, there are plenty of differences between the two areas that make the Patos-Marinza a much different operating environment.
...If you would like to continue reading,
please Sign In, JOIN SPE or Subscribe to JPT
Reviving Europe’s Largest Onshore Field
Trent Jacobs, JPT Technology Writer
01 March 2015
Norway Awards Most Licenses Ever in New Round
In need of an exploration boost, Norway doled out a record 83 production licenses in mature areas of the Norwegian Continental Shelf to 33 firms.
Best Practices for Waterflooding Optimization Improve Oil Recovery in Mature Fields
This paper presents technologies and best practices to improve oil recovery in mature fields through waterflooding optimization. These technologies have proved practical and cost-effective.
Microchannel Remediation of a Cement Packer Unlocks Mature-Field Potential
Well RXY is located in Cairn’s Ravva offshore field in the Krishna-Godavari Basin in India. One goal for the field was significant crude production by means of a secondary reservoir section.
ADVERTISEMENT
STAY CONNECTED
Don't miss out on the latest technology delivered to your email weekly. Sign up for the JPT newsletter. If you are not logged in, you will receive a confirmation email that you will need to click on to confirm you want to receive the newsletter.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT