Mars-B Development: An Evolution of Traditional Well, Rig, and Facility Design

Fig. 3—Bridge structure connecting the DVA rig to the DSM.

The Mars-B project is the operator’s sixth Gulf of Mexico (GOM) tension-leg-platform (TLP) development. The Mars-B project is aiming to unlock resources over the next 50 years through the deployment of a new 24-slot TLP structure [the Olympus direct-vertical-access (DVA) TLP] and additional subsea infrastructure for the west Boreas and south Deimos fields. The Olympus rig is a novel platform drilling rig designed specifically to meet the execution requirements of complex well designs. A high-level overview of the design challenges and the resulting surface-equipment requirements of this project is discussed in this paper.

Introduction

The operator discovered the Mars field in the Mississippi Canyon Area Block 763 in 1989, located 130 miles southeast of New Orleans in approximately 3,000 ft of water. The Mars-B project made its final investment decision in September 2010 to expand the existing Mars operation with a new 24-slot TLP structure and additional subsea infrastructure for the west Boreas and south Deimos fields. The Olympus TLP is located approximately 1 mile southwest of the existing Mars TLP and represents the first brownfield development of a deepwater field in the GOM. It will enable production of an additional 1.1 billion BOE over the approximately 700 million BOE that has been produced today with the Mars TLP.

The Mars and Deimos reservoirs are located at depths ranging from 10,500- to 25,000-ft true vertical depth (TVD) and are predominantly Upper Miocene in age, with only the shallowest parts of this succession extending into the Pliocene. These reservoirs have typically culminated in the construction of slope aprons and fans, the deposits of which now form the more than 50 stacked reservoir targets for the Olympus-TLP wells.

This article, written by JPT Technology Editor Chris Carpenter, contains highlights of paper OTC 25437, “Mars-B Development: Well Challenges and Solutions—An Evolution of Traditional Well, Rig, and Facility Design,” by Arno L.M. van den Haak, Wylie J. Cameron, Lisa S. Grant, Nor Janiah H. Japar, and Deandre R. Reagins, Shell, prepared for the 2014 Offshore Technology Conference, Houston, 5–8 May. The paper has not been peer reviewed. Copyright 2014 Offshore Technology Conference. Reproduced by permission.
...
This article is reserved for SPE members and JPT subscribers.
If you would like to continue reading,
please Sign In, JOIN SPE or Subscribe to JPT

Mars-B Development: An Evolution of Traditional Well, Rig, and Facility Design

01 February 2015

Volume: 67 | Issue: 2