Wired Drillpipe, Closed-Loop Automation Technology Drive Performance Improvement

To accelerate learning, an operator deployed a real-time, closed-loop downhole automation system (DHAS) in conjunction with wired drillpipe in the 8¾-in.-hole section. The operator also used downhole memory tools in the 5⅞-in. lateral section to collect downhole drilling parameters and vibration data. The optimization process drew upon key elements from lean manufacturing concepts. It followed a “plan, do, check, adjust” (PDCA) loop, with the DHAS and the data provided by it affecting three concurrently moving performance-improvement cycles.
Introduction
The operator selected the DHAS with 5-in. wired drillpipe because it was believed the real-time, high-speed data feed would accelerate the learning process. By making the downhole drilling environment visible in real time, the driller could apply this new understanding of the drilling environment to the automation system, to optimize drilling performance. It was also envisioned that the large amount of data available from the system would feed the PDCA cycle and result in lessons learned and performance improvements that could be implemented across the fleet. The idea was to instrument one rig and use the lessons learned to improve the performance of the entire fleet. The primary project goal was reducing cycle time while achieving a breakeven cost for the additional technology.
At the time, there was significant variability in cycle time as well as a significant difference between the best- and worst-performing rigs. To assess the rate of improvement and, thereby, the potential of the DHAS to improve drilling performance, the operator selected a lower-performance rig for the pilot test.
If you would like to continue reading,
please Sign In, JOIN SPE or Subscribe to JPT
Wired Drillpipe, Closed-Loop Automation Technology Drive Performance Improvement
12 August 2016
Automated Operations and Wired Drillpipe Benefit Arctic Drilling
This paper presents a case history of drilling automation system pilot deployment, including the use of wired drillpipe, on an Arctic drilling operation.
Automated Real-Time Torque-and-Drag Analysis Improves Drilling Performance
In this paper, the application of a real-time T&D model is demonstrated. The process of T&D analysis was automated, and the time and cost required to run physical models offline was reduced or, in some cases, eliminated.
Automation-Adoption Approach Maps Human/System Interaction
This paper describes the progress of directional-drilling-automation systems along the cognitive functions and levels of automation as defined by the Levels of Automation Taxonomy (LOAT) hierarchy introduced by the Drilling Systems Automation Roadmap Industry Initiative.