Produced-Water Reinjection—Case Study From Onshore Abu Dhabi

Getty Images

Water production normally increases as fields mature, and two main ways exist to deal with the produced water. One is to dispose of the produced water into dedicated disposal wells. The other is to reinject the produced water for pressure maintenance or sweep efficiency. In 2010, a produced-water-reinjection (PWRI) project began in a giant field that involved replacing the aquifer water being injected in one of the water-injection clusters with produced water without water treatment.

Case History

This project was conducted in a giant onshore field in Abu Dhabi. This field is approximately 85 km southwest of Abu Dhabi Island and consists of multistacked reservoirs. The main reservoir, where the project was conducted, will be referred to as Reservoir 1. Reservoir 1 has approximately 75% of the field’s proven reserves and contributed approximately 90% of the field’s oil production when the project began. Almost all the produced water in the field is injected water from Reservoir 1.

Reservoir 1 has been a waterflooded reservoir since the 1970s. The waterflooding project was completed in different stages. First, peripheral water-­injection wells were developed. At the start of the PWRI project, the average reservoir water injection was approximately 500,000 BWPD. The injection water is delivered and injected through water-injection clusters. Each cluster normally consists of a water-supply well completed through aquifers and produced by electrical submersible pumps, a surface pump, and a network of pipes distributing the water to the injection wells connected to that cluster. The nominal capacity of a cluster is 20,000–30,000 BWPD, and, on the basis of a well’s injectivity and injection requirements, five to 10 wells may be connected to each cluster.

This article, written by Special Publications Editor Adam Wilson, contains highlights of paper SPE 177538, “Produced-Water Reinjection—Case Study From Onshore Abu Dhabi,” by K. Mahmoud, SPE, A. Al Tenaiji, M. Al Sharafi, SPE, S. El-Abd, M. Abdou, SPE, and H. Hafez, Abu Dhabi Company for Onshore Petroleum Operations, prepared for the 2015 Abu Dhabi International Petroleum Exhibition and Conference, Abu Dhabi, 9–12 November. The paper has not been peer reviewed.
...
This article is reserved for SPE members and JPT subscribers.
If you would like to continue reading,
please Sign In, JOIN SPE or Subscribe to JPT

Produced-Water Reinjection—Case Study From Onshore Abu Dhabi

12 November 2016

Volume: 68 | Issue: 12