Multiphase-Flow Simulation Helps Find Optimal Lateral Length for Best Production
Wellbore lateral lengths and uniformity are important for production optimization, affecting liquid holdup and productivity throughout well production life. However, wellbore construction designed for holding leases and completed under time constraints could negatively affect production and limit operators’ potential for their acreage. This paper demonstrates a work flow to determine optimal lateral lengths and trajectories in the Midland Basin by studying the effect of the lateral length and trajectory on well production.
Introduction
Operators often use a scalar to determine wellbore contributions for wells with an atypical lateral length on their leases. The work flow presented here provides realizations to justify use of this scalar, evaluating whether lateral lengths proportionally increase production, whether wellbore contributions are uniform throughout the lateral length of the wells, and whether various wellbore deviations and tortuosities should have the same scalar applied for estimating well production.
A team investigated the effect of lateral length on well estimated ultimate recovery (EUR). The EURs were calculated from daily production data from 15 operators and then normalized by well lateral length from the top perforation to the bottom perforation. The modified hyperbolic method was used to perform the decline-curve analysis. Simply applying a scalar for the lateral length among the wells would not yield proportionate EURs. When drilled and completed in unconventional reservoirs with multiple-stage hydraulic fracturing, horizontal wells experience a decline in productivity with time because the conductivity of those man-made fractures deteriorates with production and time. Therefore, in order to understand the effect of wellbore trajectory and lateral length on production fully, the team developed a work flow to incorporate an in-depth analysis on transient effects of wellbore hydraulics combined with unconventional reservoir performance over time.
If you would like to continue reading,
please Sign In, JOIN SPE or Subscribe to JPT
Multiphase-Flow Simulation Helps Find Optimal Lateral Length for Best Production
01 November 2018
Horizontal and Complex-Trajectory Wells
With the arrival and development of rotary steerable systems in the late 1990s, the industry thought that drilling a perfectly smooth and controlled trajectory would not be an issue. Two decades later, we’re still talking about wellbore quality, especially with long and complex horizontal wells.
Proposed Steering Mechanism Reduces Tortuosity in Horizontal Wells
This paper describes a new approach to evaluating the effectiveness of the rotary-steerable-system (RSS) steering mechanism on wellbore tortuosity in horizontal wells.
Drilling for Miles in the Marcellus: Laterals Reach New Lengths
Range Resources' drilling head talks about how the company went from drilling the shortest laterals in the Marcellus to the longest and why.