ADVERTISEMENT


Gas Plus Khalakan

Gas Plus Khalakan (GPK) announced that the Shewashan-2 development well will contribute to the 10,000-B/D year-end production target for Phase 1 of the Shewashan oil field in Iraq’s Kurdistan Region. The well was drilled to a 9,081‑ft depth at a cost of USD 19.5 million. During tests, the well flowed at a maximum rate of 4,400 B/D from Cretaceous fractured carbonate reservoirs. The Shewashan-1 well is being recompleted as a deviated producing well. GPK is operator with an 80% interest in the wells.


STAY CONNECTED

Don't miss out on the latest technology delivered to your email weekly.  Sign up for the JPT newsletter.  If you are not logged in, you will receive a confirmation email that you will need to click on to confirm you want to receive the newsletter.

 

ADVERTISEMENT