Gas Plus Khalakan

Gas Plus Khalakan (GPK) announced that the Shewashan-2 development well will contribute to the 10,000-B/D year-end production target for Phase 1 of the Shewashan oil field in Iraq’s Kurdistan Region. The well was drilled to a 9,081‑ft depth at a cost of USD 19.5 million. During tests, the well flowed at a maximum rate of 4,400 B/D from Cretaceous fractured carbonate reservoirs. The Shewashan-1 well is being recompleted as a deviated producing well. GPK is operator with an 80% interest in the wells.


STAY CONNECTED

Don't miss the latest content delivered to your email box weekly. Sign up for the JPT newsletter.