Total

Total started production from the deepwater Dalia Phase 1A development, 135 km offshore Angola. The Dalia floating, production, storage, and offloading vessel came on stream in Block 17 in 2009 and is now expected to reach 200,000 B/D with the new development. The seven infill wells will contribute approximately 30,000 B/D to the block’s overall production. Total (40%) operates the block with partners Statoil (23.33%), Esso Exploration Angola Block 17 (20%), and BP Exploration Angola (16.67%).


STAY CONNECTED

Don't miss the latest content delivered to your email box weekly. Sign up for the JPT newsletter.