Hurricane Energy

Hurricane Energy completed testing of its appraisal well in the Lancaster discovery in P1368, West of Shetland. The well—to be suspended as a future producer—tested at a maximum sustainable natural flow rate of 5,300 BOE/D, and at a maximum sustainable flow rate, using artificial lift, of 9,800 BOE/D. Hurricane (100%) is operator.


STAY CONNECTED

Don't miss the latest content delivered to your email box weekly. Sign up for the JPT newsletter.