ADVERTISEMENT


Beach Energy - 2

The Geoffrey-1 well in ATP 855 in the Cooper-Eromanga basin, Australia, was spudded. It will be drilled to a planned depth of 4266 m to evaluate the shale and basin-centered gas play in the Toolachee, Daralingie, Roseneath, Epsilon, Murteree, and Patchawarra formation intervals. The operator is Beach Energy (46.9%), with Icon Energy (35.1%) and Chevron Australia Exploration 1 (18%).


STAY CONNECTED

Don't miss out on the latest technology delivered to your email weekly.  Sign up for the JPT newsletter.  If you are not logged in, you will receive a confirmation email that you will need to click on to confirm you want to receive the newsletter.

 

ADVERTISEMENT