ADVERTISEMENT


Eni

Eni is starting commercial oil and gas production at the Sankofa field offshore Ghana 3 months ahead of schedule, the company confirmed. Production was set to begin in July with output eventually to reach 45,000 B/D. The development represents phase one of the USD 7.9-billion Offshore Cape Three Points (OCTP) project, which will produce up to 180 MMscf/D of gas from the neighboring Gye Nyame field by the end of 2018. Eni, the operator, holds a 44.44% interest in OCTP with Vitol (35.56%) and Ghana National Petroleum Corp. (20%) holding the remaining stakes.


STAY CONNECTED

Don't miss out on the latest technology delivered to your email weekly.  Sign up for the JPT newsletter.  If you are not logged in, you will receive a confirmation email that you will need to click on to confirm you want to receive the newsletter.

 

ADVERTISEMENT