ADVERTISEMENT


Hyperdynamics

Hyperdynamics said that drilling of its Fatala-1 exploration well offshore the Republic of Guinea has proceeded successfully, with completion of the initial portion of the well anticipated soon. Company officials said a 36-in. conductor casing was set into the seabed at a water depth of 2897 m. As of the last week of August, the hole for the surface casing had been drilled 723 m to a water depth of 3620 m. The goal is to set a 20-in. casing once drilling to a depth of 3814 m has been accomplished. The company holds a 50% interest in the Fatala-1 venture with South Atlantic Petroleum, a privately-held exploration and production company focused on African assets.


STAY CONNECTED

Don't miss out on the latest technology delivered to your email weekly.  Sign up for the JPT newsletter.  If you are not logged in, you will receive a confirmation email that you will need to click on to confirm you want to receive the newsletter.

 

ADVERTISEMENT