DNO

DNO reported that oil production from the Peshkabir field in the Kurdistan Region of Iraq’s Tawke license has tripled to 15,000 B/D, following completion of the Peshkabir-3 well testing, stimulation, and cleanup program. Eleven zones in a 3,937‑ft horizontal section of Cretaceous and Jurassic reservoir were individually tested and flowed successfully, of which 10 were oil zones and one was a gas zone. The oil zones tested at an average of 5,340 B/D on a 64/64-in. choke, with the highest test rate achieving 7,200 B/D. A multizone combined test attained a 12,500 B/D rate on a 128/64-in. choke from five zones. DNO is the license operator with a 75% interest. Genel Energy holds the remaining stake.


STAY CONNECTED

Don't miss the latest content delivered to your email box weekly. Sign up for the JPT newsletter.