ADVERTISEMENT


Talos Energy

Hydrocarbon flow from Talos Energy’s Zama-2 ST1 appraisal well achieved a combined rate of 7,900 BOE/D without stimulation in two separate flow tests. Flow was 94% oil-weighted and 6% natural gas. Located at the Zama shallow-water discovery in Mexico’s Sureste Basin, Zama-2 ST1 is a sidetrack from the Zama-2 appraisal well. It is the second of three appraisal penetrations to be drilled at Zama by Talos and joint venture partners Premier Oil and Sierra Oil & Gas.


STAY CONNECTED

Don't miss out on the latest technology delivered to your email weekly.  Sign up for the JPT newsletter.  If you are not logged in, you will receive a confirmation email that you will need to click on to confirm you want to receive the newsletter.

 

ADVERTISEMENT