Nowadays, economic scenario imposes new challenges for cost reduction, safety improvements and production optimization especially in deepwater projects. Well design have to achieve another level of operational efficiency and safety through reducing complexity, increasing flexibility and improving availability. In the Brazilian Pre-Salt projects, Intelligent Well Completions (IWC) have been used since the early conceptual phases in order to deliver a proper reservoir and production management in the direction of exploiting the full potential of these large thickness reservoirs.

Learn More ►

 

 

Download Program ►


KEY THEMES


IWC cases history: pre-salt & global applications |Designing and using IWC for reservoir and production management | Demonstrated value of IWC in the field | Challenges & improvements on current technologies | Subsea and topside integration: flexibility vs. standardization | IWC reliability | All-electric IWC | Downhole Wet Disconnection Tool development and cases history | Research & development on IWC | Performance & health monitoring & advanced monitoring systems | Remote operations | Digital transformation | Integrating IWC with the well design: drilling, completion, sand control, flow assurance, artificial lift, well integrity and safety | Workover and P&A in wells with intelligent completion |Preparing subsea infra-structure for future “electric wells” | Energy harvesting and storage and wireless telemetry

 


WHO SHOULD ATTEND?


Completion, subsea, reservoir and production engineers as well as other professionals involved in research, development, installation and use of Intelligent Well Completion Systems.

 

Thank You to Our Sponsors

 

Platinum Sponsor

Networking Luncheons Sponsor