As part of a project that involves the use of four artificial islands to drill and complete more than 300 extended-reach-drilling (ERD) wells in a giant offshore oil field, several completion designs have been piloted for brownfield development. One well design incorporated the use of inflow-control devices (ICDs) and swell packers, which was the operator’s first use of such technology in a production well. The technology was installed in the pilot well to test inflow control and to manage future water production.
Introduction
The giant 1200-km2 offshore oil field is located 84 km northwest off Abu Dhabi Island and consists of a layered carbonate formation that was discovered in 1963. It has still only produced a small percentage of original oil in place, with water cut (WC) less than 15%. There have been almost 500 wells drilled in the field since field discovery. Development was based on pattern producer/injector wells, with each well using a dry tree on a wellhead platform tower.
To achieve the strategic goal of increasing the production rate by approximately 40% and maintaining a plateau for up to 25 years, a brownfield development plan (UZ-750) has been generated that will use four artificial islands (Fig. 1 above) with large 3,000-hp land drilling rigs. The aforementioned island arrangement will allow the drilling of approximately 360 wells that will use ERD to drill horizontal laterals approximately 10,000 ft in length at measured depths up to 35,000 ft. The brownfield development plan calls for a parallel line drive for producer/injector-well pairs, to provide optimum sweep of the reservoir.
If you would like to continue reading,
please Sign In, JOIN SPE or Subscribe to JPT
ICD Well History and Future Use in a Giant Oil Field Offshore Abu Dhabi
01 November 2015
Looking Inside the Well: An Interview With Visuray CEO Kambiz Safinya
Visuray is using its unique X-ray technology to improve downhole imaging.
Horizontal and Complex-Trajectory Wells
With the arrival and development of rotary steerable systems in the late 1990s, the industry thought that drilling a perfectly smooth and controlled trajectory would not be an issue. Two decades later, we’re still talking about wellbore quality, especially with long and complex horizontal wells.
Proposed Steering Mechanism Reduces Tortuosity in Horizontal Wells
This paper describes a new approach to evaluating the effectiveness of the rotary-steerable-system (RSS) steering mechanism on wellbore tortuosity in horizontal wells.
ADVERTISEMENT
STAY CONNECTED
Don't miss out on the latest technology delivered to your email weekly. Sign up for the JPT newsletter. If you are not logged in, you will receive a confirmation email that you will need to click on to confirm you want to receive the newsletter.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT