Unconventional-Asset-Development Work Flow in the Eagle Ford Shale

Development of the Eagle Ford shale typically consists of horizontal wells stimulated with multiple hydraulic-fracture stages. This paper presents a pragmatic integrated work flow used to optimize development and guide critical development decisions in the Black Hawk field. Geoscientists and reservoir and completion engineers worked collaboratively to identify optimal completion designs and well spacings for development focus areas. Multiple simplistic simulation models were history matched to existing production wells.

Introduction

In 2008, the operator drilled several successful wells in the Hawkville field of what would become the Eagle Ford shale play. Early results led to substantial land acquisition. The Eagle Ford, while continuous over wide sections, varies substantially in terms of fluid and rock properties. Fig. 1 shows a cross section for an arbitrary line through Black Hawk and Hawkville to the Maverick basin, showing the relative changes in thickness and Young’s modulus.

This article, written by JPT Technology Editor Chris Carpenter, contains highlights of paper SPE 168973, “Unconventional-Asset-Development Work Flow in the Eagle Ford Shale,” by David Cook, Kirsty Downing, Sebastian Bayer, Hunter Watkins, Vanon Sun Chee Fore, Marcus Stansberry, Saurabh Saksena, and Doug Peck, BHP Billiton Petroleum, prepared for the 2014 SPE Unconventional Resources Conference—USA, The Woodlands, Texas, USA, 1–3 April. The paper has not been peer reviewed.
...
This article is reserved for SPE members and JPT subscribers.
If you would like to continue reading,
please Sign In, JOIN SPE or Subscribe to JPT

Unconventional-Asset-Development Work Flow in the Eagle Ford Shale

01 July 2014

Volume: 66 | Issue: 7

ADVERTISEMENT