Cement Placement With Tubing Left in Hole During Plug-and-Abandonment Operations

One way to reduce costs during plugging and abandonment is to leave most of the production tubing in the well. A major concern with such an approach, however, is whether the cement will displace the original fluid improperly because of lack of tubing centralization and possible unfavorable flow dynamics in the annulus. This paper presents full-scale tests that show it is possible to obtain good cement placement when the tubing is left in the hole.
Introduction
The fundamental goal of plugging and abandonment is to restore caprock functionality to maintain well integrity permanently. Normally, these operations are conducted by removing completion equipment and placing a series of cement plugs. One way to reduce costs is to leave most of the production tubing in the well, which would save significant rig time. A major concern with such an approach, however, is whether the cement has displaced the original fluid properly in the annulus outside the tubing where the plug is planned. Poor cement quality there may result from designing the original cement job with insufficient cement slurry, from a lack of tubing centralization, or from unfavorable flow dynamics in the annulus. Regardless of the equipment used for the operation, the most economical way is to leave as much of the tubing as possible in the well. If tubing can be left in hole in a way that satisfies long-term abandonment criteria, a significant restriction to cost-efficient plugging and abandonment is overcome.
This paper presents full-scale tests that confirm the possibility of obtaining good cement placement when the tubing is left in the hole. This is the case both with and without control lines attached to the tubing.
If you would like to continue reading,
please Sign In, JOIN SPE or Subscribe to JPT
Cement Placement With Tubing Left in Hole During Plug-and-Abandonment Operations
01 May 2017
What Happens When Facebook Technology Meets Oil Well Records
The same tools that make it fun and easy for you to see a friend's updates online are also pretty good at tying together unconnected databases holding valuable well information.
The UK North Sea: How To Manage an Aging Basin
A recent spike in production has engendered a cautiously optimistic outlook for the UKCS, but will it do anything to stave off the overall decline of the mature basin?
Coiled-Tubing Telemetry Intervention in Shut-In Conditions
When a new horizontal well in Asia was incapable of unassisted flow, coiled tubing (CT) was selected for the perforation and stimulation intervention. Mechanical isolation was required to ensure that the stimulation fluids entered only the new zones.
ADVERTISEMENT
STAY CONNECTED
Don't miss out on the latest technology delivered to your email weekly. Sign up for the JPT newsletter. If you are not logged in, you will receive a confirmation email that you will need to click on to confirm you want to receive the newsletter.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT