LGO

LGO has started production from a new interval on well GY-671 in its solely owned Goudron field in Trinidad. A total of 208 ft of perforations were added to the well’s Upper C-sand reservoir following the isolation of the zone with a packer. The interval had never been completed in the various surrounding wells. After initial cleanup operations, the well flowed at rates of up to 240 B/D of oil before being choked back to a natural stabilized rate of 80 B/D. The additional production will complement a base field rate that averaged 403 B/D in March.


STAY CONNECTED

Don't miss the latest content delivered to your email box weekly. Sign up for the JPT newsletter.