Petroceltic International

Petroceltic International said that the first of up to 24 new development wells planned in Algeria’s Ain Tsila gas and condensate field was successful. The AT-10 well, situated about 2 miles from the AT-1 field discovery well, reached a total depth of 6,578 ft. Wireline logs indicated that the expected initial offtake rate would be comparable to the AT-1 and AT-8 wells, both of which test-flowed at more than 30 MMcf/D. Petroceltic is the operator with a 38.25% interest in the production-sharing contract that covers the Ain Tsila output. The remaining interests are held by Sonatrach (43.375%) and Enel (18.375%).


STAY CONNECTED

Don't miss the latest content delivered to your email box weekly. Sign up for the JPT newsletter.