ADVERTISEMENT


ConocoPhillips

ConocoPhillips has started production at its Surmount 2 oil sands project, which is located 63 km southeast of Fort McMurray in the Athabasca region of Alberta, Canada.  Production will ramp up through 2016 and 2017, adding 118,000 BOPD of gross capacity. Total gross capacity for Surmount 1 and 2 is expected to reach 150,000 BOPD. ConocoPhillips (50%) is the operator with Total (50%).


STAY CONNECTED

Don't miss out on the latest technology delivered to your email weekly.  Sign up for the JPT newsletter.  If you are not logged in, you will receive a confirmation email that you will need to click on to confirm you want to receive the newsletter.

 

ADVERTISEMENT