Beach Energy

Beach Energy spudded the Elliston-2 development well in PPL 249, on the western flank of the Cooper basin in South Australia. The well will be drilled to a total depth of approximately 1655 m, which is expected to take 1 week. Beach intends to use the well to accelerate production from the Namur sandstone reservoir. Beach (75%) is operator, with partner Cooper Energy (25%).


STAY CONNECTED

Don't miss the latest content delivered to your email box weekly. Sign up for the JPT newsletter.